ENGINEERING & INSTALLATION CRAFT
Technical Measurement & Laser Installation Standards
Real-world security and insulation depend on installation precision. In Bursa (Yıldırım, Nilüfer, Osmangazi, Gürsu, Kestel), our specialists provide on-site laser surveys and clean installation.
Floor Level & Site Prep
Finished parquet or marble floor elevations and baseboard allowances form the foundation of accurate door sizing.
3D Laser Calibration & Anchoring
Frames are leveled with 3D laser instruments and anchored with 12 mm steel dowels so the leaf stays balanced at any opening angle.
Acoustic & Thermal Sealing
Frame-to-wall cavities are sealed with high-density acoustic polyurethane foam to minimize sound, dust, and heat transfer.
Preliminary Technical Production Report
“Erlin Kapı systems are calibrated to leave a 20 mm mounting clearance on each side.” Exact manufacturing dimensions are verified during our complimentary laser site survey in Bursa.
CARE & LONGEVITY
Basic Door Care & Maintenance Guidelines
Surface Cleaning
Wipe lacquer, wood, PVC, and Laminox surfaces with a lightly damp microfiber cloth; never use solvents, bleach, or abrasive pads.
Lock & Hinge Care
Do not spray oil or sticky lubricants into lock cylinders; clean dust periodically with a dry cloth.
Gasket & Threshold Care
Avoid wedging hard objects between the frame and seal, and remove post-construction plaster residue before it dries.
OLD DOOR REMOVAL & REPLACEMENT
Same-Day Door Replacement Without Plaster Damage
Removal of your old timber or steel door and installation of a new ERLİN KAPI door is typically completed within 2–3 hours.